By Darrell G. Stiffler, PMP
For years, the Project Management Institute (PMI) has been touting the virtues of the Precedence Diagramming Method (PDM) as the method to use in the Critical Path Methodology (CPM) construction of a network diagram. The network diagram uses boxes or rectangles, referred to as nodes, to represent activities, and by connecting the nodes with arrows it illustrates the logical relationships that exist between the nodes. However, the illustration of a network diagram in the Project Management Body of Knowledge (PMBOK) is OK, but the nodes illustrated are poor. In trying to perform the forward pass, backward pass and calculating float the illustration has no value. Because of the PMBOK vacuum of detail and poor illustration of the diagram node, others have used their own style of node for the critical path calculation. There are many different ways to display the node, and un-standardization has allowed the whole subject to become confusing. I propose that PMI publish in the PMBOK a standard node. This would establish a standard and make it easier for all those creating a PDM much easier.
Reference Materials for Procurement Management
You Node What?
What Happened to the Triple Constraints Model?
Don’t Put Project Management in a Box